Narrative Description of Project
The Bishkek – Naryn – Torugart road is an important regional trade corridor that forms part of the CAREC Transport Corridor 1. After concluding the works of rehabilitating its central section between km 272 and km 365, a new contract was concluded to perform road rehabilitation works within two packages C and D.
Package C includes works for rehabilitation of 6 roads and construction of new water supply pipe as follows:
Construction of New Water Supply Pipe along Razzakova and Sheralieva Streets
Package D includes works for rehabilitation and construction of 3 roads as follows:
The project roads total length is 30.59 Km.
Value of construction works $8,377,857.93
Description of Actual Services Provided