Narrative Description of Project
The corridor improvement Program, a component of the Urban Transport Development Project (UTDP) prepared by TEAM International, proposed a grade separation at the intersection of Old Saida Road with the roads leading to Bchamoun and Aramoun. Due to the delay in construction in Peripherique and other freeways in the area, another solution based on a large roundabout was also proposed.
The estimated construction works value is 2 million USD.
Description of Actual Services Provided
1- Validate the technical feasibility of the proposal to be adopted, based on traffic simulation.
2- Economic analysis of adopted solution.
3- Detailed design and preparation of the implementation tender documents.