Case Study

Preliminary and Final Design of Casablanca – Settat – Marrakesh Motorway

Description of Actual Services Provided

The alignment definition was completed for the entire length of Casablanca – Marrakesh 188Km.

Preliminary design for Casablanca – Settat section was completed in 1994 – detailed design of this section is in progress.