Preparation of Scope of Work For the Feasibility Study and preliminary Engineering Design of the Public Transport system in the City of Taif.
Narrative Description of Project
The planned public transport system for the city of Taif includes a bus network composed of buses running in mixed traffic, busses on exclusive bus lanes, and a BRT line. The assignment includes preparing the TOR for a feasibility study and preliminary design of the system
Description of Actual Services Provided
Definition of system’s components
Setting the objectives and deliverables of the feasibility study
Setting the level of detail required from the preliminary design.
Preparation of tender documents for the down-stream phases of the project