Case Study

Preparation of the Final Designs for the Implementation of Al-Talayea Viaduct and its Road Connection to Al-Bijaiah Street in Baghdad

Narrative Description
of Project

The  project is consisted by :

  1. 57,000 m2 of post tension and pretension Viaducts.
  2. 2.5 Km of 3 Lains each way divided Highway.
  3. 3.5 Km of different types of roads and access ramps.

The Goals of the project are : To Enhance , keep it safe and  to avoid the at grade crossing as much as possible – the traffic flow between the Liqa’a Square , Arabian square , intersected with Airport Highway , sheikh Maruf Square , Al Talayea Square and their road connection.

Accordingly we have  conducted the necessary studies, traffic movement counting ,the site conditions , the environment impact and finding the appropriate solution … Noting that the project is under construction.

Description of Actual Services Provided

  • Site visit to project location,
  • Longitudinal road axis details
  • aligned with the site.
  • Bridges executive drawings.
  • Road cross-sections drawings.
  • Bridge calculation notes.
  • Bridge deep foundation drawings.
  • Drainage drawings.
  • Street lighting…