Case Study

Supervision of Installation of Traffic Control Systems and Guard Rails on Bahsas – Mina and Jiyeh – Zahrani Motorways

Narrative Description
of Project

The works included installing signing, marking and safety equipment on parts of motorway network in North and South Lebanon, with a total value of USD 2.2 m.

Description of Actual Services Provided

The objective of this contract is to supervise the contractors executing the installation of traffic control signs and safety equipment on part of the North Motorway, Bahsas – Mina Section and Part of the South Motorway (Jiyeh – Zahrani, except within Saida).

The responsibilities include:

  • Coordination among all contractors
  • Schedule control
  • Checking shop drawings
  • Checking location of sign installation
  • Overall project control
  • Approval of materials submittals
  • Propose solutions for technical difficulties that might arise
  • Assist the CEGP in the reception of works.