Narrative Description of Project
Several interchanges.
Highlights of the project included:
Description of Actual Services Provided
The objective of this contract was to provide technical assistance, supervision of construction of a
14-Km 6-lane motorway with service roads on both sides. The project included two major bridges, one at Jadra and another at Zahrani. The project also included 18 grade separations, tens of hydraulic structures, and several interchanges.
The tender documents covered only preliminary designs of super structures. The Contractor was to submit detailed designs for approval by the Engineer. All proposed design changes were to be studied and approved by the Engineer.
The Engineer’s staff on this project included site engineers, highway engineers, structural engineers, geotechnical engineers, material inspectors, lab technicians, and construction supervisors.
The responsibilities included all contract administration functions: quality, cost, and time control.