Narrative Description of Project
Motorway Construction works of Asilah –Sidi El Yamani consists of geotechnical and earthworks, structure, drainage, pavement and civil works for:
– 15Km of motorway in a very critical soil conditions;
– Two interchanges;
– Six bridges (4 underpasses and 2 overpasses);
– Stormwater, wastewater and utilities networks.
Description of Actual Services Provided
The realized tasks include:
– Control and verification of the design works performed during implementation
– Review of the alternative solutions suggested by the Contractor and/or the Client (ADM);
– Performing the complementary studies and eventual drawings adjustments in conformity with the actual
Field conditions;
– Assistance in the preparation of the as-built drawings.